![]() For example, the assault and uncrewed aircraft systems minimally met the threshold for a credible cost estimate. The cost and schedule estimates for these aircraft development efforts did not always meet leading practices. The first phase is to meet urgent battlefield needs within 2 years the next is to develop a new vehicle to conduct reconnaissance missions. Future Tactical Unmanned Aircraft System involves acquiring uncrewed vehicles in phases.In fiscal year 2023, the Army reported awarding a contract to a single vendor to complete preliminary design, deliver a virtual prototype, and deliver a physical prototype for flight tests. Future Long Range Assault Aircraft is intended to conduct long-range assault missions and serve as a multi-role aircraft to transport personnel and equipment.Acquisition officials are currently conducting an analysis of alternatives and developing two prototypes. Future Attack Reconnaissance Aircraft is intended to address the Army's capability gap for a dedicated, armed aerial reconnaissance platform, and plans to deliver aircraft in 2030.The Army is currently developing two crewed and one uncrewed aircraft systems. ![]() Aircraft in this portfolio, known as Future Vertical Lift, are to perform attack, transport, and reconnaissance missions, and are designed to have upgraded capabilities-for example, increased payload and range.Īrmy Future Vertical Lift Prototype Designs and Aircraft Demonstrators The Army is developing several aircraft systems to supplement and replace its aging fleet of helicopters.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |